How to Program an AC Inverter: Step-by-Step Guide (Basic , Advanced and Communication)

How to Program an AC Inverter

Programming an AC inverter is the most critical task after wiring a motor. Many beginners assume that once the inverter powers up, it will automatically run the motor correctly. In real industrial environments, this assumption leads to frequent faults, unstable operation, and premature motor damage.

Incorrect inverter programming is one of the main causes of:

  • Overcurrent and overvoltage trips

  • Motor overheating

  • Mechanical shock to gearboxes and belts

  • Poor speed accuracy

  • Unnecessary energy losses

This article focuses only on AC inverter programming, from factory reset to advanced tuning. It explains not only which parameters to set, but also why they exist, how they interact, and how to verify correctness using equations and real commissioning logic.

The goal is to help beginners think like professional commissioning engineers.

How to Program an AC Inverter


Table of Contents

Programming Strategy Used by Professionals

Experienced engineers never program inverters randomly. They follow a strict sequence:

  1. Factory reset and clean setup

  2. Motor rated data configuration

  3. Frequency and voltage limits

  4. Acceleration and deceleration behavior

  5. Command and speed reference sources

  6. Protection settings

  7. No-load and load testing

  8. Advanced tuning and optimization

  9. Documentation and backup

Following this sequence avoids 90% of inverter problems.


Step 1: Factory Reset and Initial Preparation

Why Factory Reset Is Mandatory

Inverters may contain:

  • Old motor data

  • Hidden test parameters

  • Modified protection limits

A factory reset ensures a known, stable starting point.

Typical Reset Process

Factory Reset = Enable

Power OFF → wait → Power ON

After reset:

  • Control source returns to default

  • Frequency reference resets

  • Protection values normalize

Always confirm reset completion before continuing.


Step 2: Motor Rated Data Programming (Foundation Step)

The inverter internally builds a motor model.
This model depends entirely on accurate nameplate data.

Motor Rated Data

Mandatory Motor Parameters

Parameter Why It Is Critical
Rated Voltage Correct V/F scaling
Rated Current Overload and current limit
Rated Frequency Base speed reference
Rated Speed Slip calculation
Rated Power Thermal model

Example Motor Data Entry

Rated Voltage = 400 V

Rated Current = 8.0 A


Rated Frequency = 50 Hz


Rated Speed = 1440 RPM


Rated Power = 4 kW

Speed Verification Equation

Speed equation

For a 4-pole motor at 50 Hz:

Slip:

This confirms the motor data is realistic.


Step 3: Base Frequency and Maximum Frequency

Base Frequency

  • Set equal to motor rated frequency

Base Frequency = 50 Hz

This is where rated voltage and rated torque are achieved.

Maximum Frequency

  • Beginners should keep it equal to base frequency

Maximum Frequency = 50 Hz

Increasing maximum frequency:

  • Increases speed

  • Reduces available torque

  • Increases mechanical stress


Step 4: Minimum Frequency Setting

Minimum frequency prevents unstable operation at very low speed.

Why It Matters

At low frequency:

  • Cooling decreases

  • Torque becomes unstable

  • Motor may vibrate or stall

Recommended Values

Minimum Frequency = 37 Hz

If vibration occurs → increase minimum frequency.


Step 5: Voltage–Frequency (V/F) Curve Configuration

To maintain constant torque:

Linear V/F Curve (Most Applications)

Example motor:

  • 400 V at 50 Hz

At 25 Hz:

Incorrect V/F causes:

  • High current (too much voltage)

  • Torque loss (too little voltage)


Step 6: Acceleration Time Programming

Acceleration time defines how quickly frequency increases from zero.

Why Acceleration Is Critical

Fast acceleration causes:

  • High inrush current

  • Mechanical shock

  • Overcurrent trips

Typical Acceleration Times

Application Time
Fans 5–10 s
Pumps 10–15 s
Conveyors 15–25 s
High inertia 20–40 s

Example:

Acceleration Time = 18 s

Step 7: Deceleration Time and Regenerative Energy

During deceleration, the motor acts as a generator.

What Happens Physically

  • Mechanical energy converts to electrical energy

  • DC bus voltage rises

  • Overvoltage trip occurs

Safe Deceleration

Deceleration Time = 2030 s

If fast stopping is required:

  • Enable DC braking

  • Install braking resistor


Step 8: Start/Stop Command Source

The inverter must know where commands come from.

Start/Stop Command Source

Beginner Recommendation

Start/Stop Source = Keypad

This simplifies testing and troubleshooting.
External push buttons or PLC control should be added later.


Step 9: Speed Reference Configuration

Speed reference defines the desired motor speed.

Common Sources

Source Signal
Keypad Digital
Potentiometer 0–10 V
PLC 4–20 mA

Potentiometer Scaling Example

0 V = 0 Hz

10 V = 50 Hz

Incorrect scaling leads to limited or unstable speed control.


Step 10: Direction Check and Rotation Verification

After first run:

  • Verify motor direction

  • Ensure it matches mechanical requirements

If incorrect:

  • Change direction parameter or

  • Swap any two motor output phases

Never swap input supply phases.


Step 11: No-Load and Load Testing

No-Load Test

  • Run at 10–20 Hz

  • Current should be 30–40% of rated

Load Test

  • Increase frequency gradually

  • Monitor:

    • Output current

    • Motor temperature

    • Vibration and noise

If current exceeds rated:

  • Increase acceleration time

  • Reduce load

  • Recheck motor data



Advanced AC Inverter Programming Parameters

⚠️ Adjust advanced parameters only after basic operation is stable


1. Motor Auto-Tuning

Auto-tuning allows the inverter to measure real motor characteristics.

Benefits

  • Improved torque accuracy

  • Better low-speed stability

  • More precise current control

Types

Type Rotation Use
Static No Safe initial tuning
Dynamic Yes High precision

Best practice:

  • Disconnect load

  • Perform static tuning first

  • Save parameters afterward


2. Slip Compensation

As load increases, motor speed drops due to slip.

Slip compensation automatically corrects this.

Slip Equation

Typical Setting

Slip Compensation = 25%

Used in:

  • Conveyors

  • Mixers

  • Extruders


3. Torque Boost (Low-Frequency Boost)

At low speed, voltage drops and torque weakens.

Torque boost increases voltage slightly at low frequency.

Typical Setting

Torque Boost = 38%

Too much boost causes overheating and overcurrent.


4. Current Limit and Stall Prevention

Instead of tripping, the inverter limits current and reduces speed.

Typical Range

Current Limit = 120150% of rated current

Used in:

  • Crushers

  • Feed conveyors

  • Heavy-load systems


5. Electronic Thermal Overload (I²t Protection)

Motor heating is calculated as:

Overload Class Selection

Class Application
10 Low inertia
20 Medium inertia
30 High inertia

Wrong selection causes false trips or motor damage.


6. Carrier Frequency (PWM Frequency)

Effect of Carrier Frequency

Increase Result
Noise Decreases
Inverter heat Increases
Efficiency Decreases

Typical Value

Carrier Frequency = 48 kHz

7. DC Braking Parameters

DC braking injects DC into the motor to stop it quickly.

Parameters

  • DC braking start frequency

  • DC voltage level

  • Braking time

Used in:

  • Positioning conveyors

  • Cutting machines

  • Packaging equipment


8. Flying Start (Catch-on-the-Fly)

Allows the inverter to synchronize with a rotating motor.

Applications

  • Power loss recovery

  • Fans and pumps

  • High-inertia loads

Prevents overcurrent during restart.


9. Preset Speeds (Multi-Speed Control)

Allows fixed speeds without analog signals.

Example:

Speed 1 = 15 Hz

Speed 2 = 30 Hz


Speed 3 = 45 Hz

Used in washing systems and indexing conveyors.


Practical Programming Projects

Project 1: Variable-Speed Conveyor

  • Min freq: 5 Hz

  • Max freq: 45 Hz

  • Accel: 18 s

  • Decel: 22 s

Project 2: Energy-Saving Pump

Pump power relationship:

Reducing speed to 80%:

➡ Nearly 49% energy saving


Common Programming Mistakes

Mistake Result
Wrong motor current Frequent trips
Fast acceleration Overcurrent
No slip compensation Speed drop
Excess torque boost Overheating

Commissioning Checklist

✔ Factory reset completed
✔ Motor data verified
✔ Accel/decel tested
✔ Rotation confirmed
✔ Current within limits
✔ Parameters backed up


Conclusion

Programming an AC inverter is a structured engineering process, not trial and error. When parameters are entered logically—starting from motor data, followed by frequency control, dynamic behavior, and advanced tuning—the inverter becomes a reliable, efficient, and safe control system.

Mastering inverter programming gives beginners:

  • Professional commissioning skills

  • Reduced downtime

  • Energy efficiency expertise

  • Strong automation foundation



AC Inverter Communication

Why Communication Is Important in AC Inverter Programming

In modern automation systems, an AC inverter rarely works alone. Instead of using only local keypads or simple push buttons, inverters are commonly connected to PLCs, HMIs, SCADA systems, and industrial networks. Communication allows centralized control, monitoring, diagnostics, and integration into automated production lines.

AC Inverter Communication

Without correct communication settings, even a perfectly programmed inverter will:

  • Ignore speed commands

  • Fail to start or stop remotely

  • Show incorrect status on HMI

  • Generate communication faults

Therefore, communication programming is a core part of inverter commissioning, not an optional feature.


Basic Communication Concept in Inverters

Communication replaces traditional control wiring.

Without Communication

  • Digital inputs → Start / Stop

  • Analog input → Speed reference

  • Limited feedback

With Communication

  • Start/Stop via network

  • Speed reference via network

  • Real-time feedback (frequency, current, alarms)

  • Fault diagnostics

  • Parameter access

This reduces wiring, improves reliability, and increases flexibility.


Common Industrial Communication Protocols Used with Inverters

Most AC inverters support one or more of the following protocols:

Protocol Typical Use
Modbus RTU Simple PLC & HMI systems
Modbus TCP Ethernet-based systems
Profibus Siemens automation
Profinet High-speed Ethernet
EtherNet/IP Allen-Bradley systems
CANopen Motion and compact systems
RS-485 (physical layer) Used by Modbus RTU

For beginners, Modbus RTU is the most common and easiest to start with.


Communication Hardware Setup (Physical Layer)

Typical RS-485 Wiring (Modbus RTU)

  • Two data lines: A (+) and B (–)

  • Optional signal ground

  • Daisy-chain topology (not star)

Wiring Rules

  • Use twisted pair cable

  • Avoid long stubs

  • Use termination resistor at the last device

  • Keep cable away from power lines

Incorrect wiring causes:

  • Intermittent communication

  • Random faults

  • No response from inverter


Step 1: Selecting Communication as Control Source

Before communication works, the inverter must be told to accept commands from the network.

Typical Parameters

Command Source = Communication

Speed Reference Source = Communication

If this step is missed:

  • PLC sends commands

  • Inverter ignores them

  • Motor does not run

This is one of the most common beginner mistakes.


Step 2: Communication Address (Node ID / Slave ID)

Each inverter on a network must have a unique address.

Example

Slave Address = 3

Rules:

  • No two devices share the same address

  • Address range depends on protocol (often 1–247 for Modbus)

Duplicate addresses cause communication failure for all devices.


Step 3: Communication Speed (Baud Rate)

Baud rate defines how fast data is transmitted.

Common Baud Rates

  • 9600

  • 19200

  • 38400

  • 57600

Example

Baud Rate = 9600 bps

Important:

  • PLC, HMI, and inverter must match exactly

  • Higher speed is not always better for noisy environments


Step 4: Data Format (Parity, Data Bits, Stop Bits)

All devices must use the same data format.

Typical Modbus RTU Setting

Data Bits = 8

Parity = Even


Stop Bits = 1

Mismatch causes:

  • Communication timeouts

  • CRC errors

  • Unstable connection


Step 5: Communication Timeout and Fault Response

Communication timeout defines how long the inverter waits for valid data.

Example

Communication Timeout = 1000 ms

If communication is lost:

  • Inverter can stop the motor

  • Hold last speed

  • Trigger fault

Recommended Behavior for Safety

On Communication Loss = Ramp Stop

This prevents uncontrolled operation.


Control Word and Status Word Concept

Most communication protocols use control words and status words.

Control Word (Sent to Inverter)

Controls:

  • Start / Stop

  • Direction

  • Reset faults

Status Word (Sent from Inverter)

Provides:

  • Run status

  • Fault status

  • Ready state

  • Direction feedback

Example Logic

  • PLC sends Start bit = 1

  • Inverter runs motor

  • Inverter returns Running bit = 1

This handshake confirms correct operation.


Speed Reference via Communication

Instead of analog signals, speed is sent digitally.

Example (Modbus)

  • Speed register value = 2500

  • Scaling:

    0 0 Hz

    5000 50 Hz

So:

Incorrect scaling causes:

  • Wrong motor speed

  • Sudden jumps

  • Operator confusion

Always confirm scaling parameters.


Monitoring Data via Communication

Communication allows real-time monitoring of:

Parameter Benefit
Output frequency Speed verification
Motor current Load monitoring
DC bus voltage Power quality
Fault codes Fast diagnostics
Run hours Maintenance planning

This data is critical for predictive maintenance.


Fault Handling and Diagnostics Over Communication

When a fault occurs:

  • Inverter sends fault code

  • PLC or HMI displays alarm

  • Maintenance reacts faster

Example Fault Actions

  • Overcurrent → increase acceleration time

  • Overvoltage → increase deceleration time

  • Overload → check mechanical load

Communication drastically reduces troubleshooting time.


Multi-Inverter Communication Systems

In large systems:

  • One PLC controls multiple inverters

  • Each inverter has a unique address

  • Same network, same protocol

Example

Inverter 1Address 1 → Conveyor

Inverter 2Address 2 → Pump


Inverter 3Address 3 → Fan

This reduces:

  • Wiring

  • Panel size

  • Commissioning time


Common Communication Problems and Solutions

Problem Cause Solution
No response Wrong address Check node ID
Intermittent fault Noise Improve grounding
CRC errors Wrong parity Match settings
Drive won’t run Wrong control source Select communication
Wrong speed Scaling mismatch Correct parameters

Best Practices for Reliable Inverter Communication

✔ Use shielded twisted pair cable
✔ Ground shields at one point only
✔ Match all communication parameters
✔ Document register addresses
✔ Test with one inverter first
✔ Save parameter backup


Why Communication Programming Matters (Industrial Insight)

From real industrial installations:

  • Over 40% of commissioning delays are communication-related

  • Most issues are parameter mismatches, not hardware faults

  • Proper communication setup reduces downtime dramatically

Correct communication turns an inverter into a smart field device, not just a motor driver.


Final Note

Communication programming is the bridge between standalone motor control and full automation systems. When configured correctly, it enables centralized control, accurate monitoring, fast diagnostics, and future system expansion.

Leave a Reply

Your email address will not be published. Required fields are marked *